An ISO certified metal engineering unit was facing an acute labor problem. It sought the help of Environics in a bid to resolve the issue. Environics surveyed the affected plant and carried out the necessary corrections. Soon after the client called to report negative results. The labor unrest had actually increased further and there was a lockout at the plant! He was advised to wait and report back after two weeks. When he did not, Environics followed up proactively. The client was apologetic but elated. Two weeks after the corrective measures, he had been able to terminate the rabble-rousers and make a fresh start with a committed workforce. His firm’s productivity graph has been going north ever since.
An engineering firm tackled labor problem
September 26, 2022